NEW QUESTION 273
To detect the presence of assignable causes of variation is the objective of:

  • A. Statistical process control
  • B. Critical process control
  • C. Analytical cost assessment
  • D. Frequency variation control

Answer: A

 

NEW QUESTION 274
It is virtually impossible to be the best in every dimension of competition. Firms should in general:

  • A. Should try to be the best in the market for the order winners.
  • B. A & B
  • C. Strive to provide at least minimum level of acceptance for each of the order qualifiers
  • D. Should keep in mind the pace of change

Answer: B

 

NEW QUESTION 275
The immediate or most current period is called

  • A. Action bucket
  • B. Planning horizon
  • C. Time buckets
  • D. Both a & B

Answer: A

 

NEW QUESTION 276
to the marketplace depends on being able to provide shorter lead times and better due date performance.

  • A. Reliability
  • B. Equivalence
  • C. Responsiveness
  • D. Productivity

Answer: C

 

NEW QUESTION 277
Acme Chemical Company has a price order winner, which actions are consistent with this advantage?

  • A. level production strategy,freight consolidation, and SPC
  • B. level production strategy, LTL transport, and incoming inspection
  • C. combination production strategy, freight consolidation, and incoming inspection
  • D. chase production strategy, freight consolidation, and kaizan teams

Answer: A

 

NEW QUESTION 278
What is the demonstrated weekly capacity of a line based upon the following data?
Efficiency = 80%, Utilization = 100%, Available weekly hours = 1,000. Last 5 weeks output (in standard hours), 1000, 1,100, 1,200, 900, 1,300

  • A. 1,500
  • B. 1,000
  • C. 0
  • D. 1,100

Answer: D

 

NEW QUESTION 279
A guide for all in the organization about how products and services should be provided is known as:

  • A. Commitment
  • B. Customer focus
  • C. Total workflow
  • D. Quality policy statement

Answer: D

 

NEW QUESTION 280
Route sheet or a routing file gives information in the manufacturing of a product such as:

  • A. Operations required making the product
  • B. Sequence of operations
  • C. Equipment and accessories required
  • D. All of these

Answer: D

 

NEW QUESTION 281
Which function is to determine the need for labor, equipment, and material to meet the priority plans?

  • A. Training level
  • B. Frequency planning
  • C. Work-in-progress planning
  • D. Capacity planning

Answer: D

 

NEW QUESTION 282
Which forecast performance measure detects bias?

  • A. tracking signal
  • B. standard deviation
  • C. MAD
  • D. MAPE

Answer: A

 

NEW QUESTION 283
is difference between the total planned for a given period and the
actual total for that period.

  • A. Total control rate
  • B. Increasing rate
  • C. Collective concern
  • D. Cumulative variance

Answer: D

 

NEW QUESTION 284
Assemble- to-order is a subset of make-to-order. Which of the following is needed to make a production plan for make-to-order products?

  • A. Opening backlogs of customer orders
  • B. Forecasts by period for the planning horizon
  • C. Desired ending backlog
  • D. All of these

Answer: D

 

NEW QUESTION 285
What consists of taking a sample of a batch of product and using it to estimate the overall quality of the batch?

  • A. Analytical sampling
  • B. Batch sampling
  • C. Acceptance sampling
  • D. Statistical sampling

Answer: C

 

NEW QUESTION 286
Operations management works in a complex environment affected by many factors. Among the most important are:

  • A. all of these
  • B. Customer expectations and quality
  • C. Government regulation
  • D. the economy and competition

Answer: A

 

NEW QUESTION 287
Because of its labor contracts, a company must hire enough labor for 100 units of production per week on one shift or 200 units per week on two shifts, it cannot hire, layoff, or assign overtime. During the fourth week, workers will be available from another department to work part or all of an extra shift (up to 100 units). There is a planned shutdown for maintenance in the second week, which will cut production to half. Develop a production plan. The opening inventory is 200 units, and the desired ending inventory is 300 units.

If the opening backlog is 500 units, forecast demand is 700 units. And production is 800 units, what will be the ending backlog?

  • A. 600 units
  • B. All of these
  • C. 500 units
  • D. 400 units

Answer: D

 

NEW QUESTION 288
Electric data interchange enables customers and suppliers to electromagnetically exchange transaction information.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 289
Raw materials are recorded into work-in-process, when work is completed and becomes finished goods; the work-in-process inventory is relieved by multiplying the number of units completed by the number of parts in the bill of material, in which system?

  • A. demand pattern system
  • B. leveling system
  • C. Work-in-progress system
  • D. post-deduct system

Answer: D

 

NEW QUESTION 290
A work center working one 8 hour shift for 5 days a week is available _____________ hours a week is available

  • A. 35 hours as lunch timings
  • B. 40 hours
  • C. 45 hours
  • D. 30 hours

Answer: B

 

NEW QUESTION 291
Forecasts are more accurate for larger groups of items than for individual items in a group?

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 292
Poke-Yoke (Fail Safe) tries to change either the process or its resources, thus eliminating the need to rely on human experience and knowledge. Examples include:

  • A. Both of these
  • B. Put a template over an assembled component to show operators where specific parts go
  • C. None of these
  • D. Use color-coded parts

Answer: A

 

NEW QUESTION 293
FLY Manufacturing is an aircraft manufacturer. They produce executive jets on an Engineer-to-order basis. Which of the following MRPII processes would most likely NOT be required at FLY?

  • A. Distribution Requirements Planning
  • B. Sales & operations Planning
  • C. materials requirements planning
  • D. Business Planning

Answer: A

 

NEW QUESTION 294
......