NEW QUESTION # 94
You are designing a highly resilient network, which two high availability techniques should you use?
(Choose two.)
- A. Redundant power supplies for network devices.
- B. Virtual Chassis for EX devices.
- C. SFP interfaces.
- D. High bandwidth uplink.
Answer: A,B
NEW QUESTION # 95
What are two aspects of brownfield projects? (Choose two.)
- A. Old equipment that should be replaced.
- B. Next-generation networks created from the ground up.
- C. Legacy applications that are no longer used.
- D. New networks with few or no restraints to consider.
Answer: A,C
NEW QUESTION # 96
You are performing a risk assessment for a network design.
Which statement is true in this scenario?
- A. All identified risks must have a mitigation plan in place.
- B. A network must be designed for an uptime of five nines.
- C. The likelihood of a risk occurring should not be considered.
- D. Some risks can be safely ignored.
Answer: D
NEW QUESTION # 97
You are gathering information to determine capacity, density, and scaling of systems for a campus switching design.
What information is critical to the design? (Choose three.)
- A. the number of users that are home office/mobile workers
- B. the number of guest users or contractors accessing with a mobile hot spot
- C. the number of unmanned IP-enabled end systems (e.g., HVAC, network printers, PoS machines)
- D. the number of users with a fixed desktop station and attached IP phone
- E. the number of physical VolP phones not connected to a desktop
Answer: C,D,E
NEW QUESTION # 98
Which statements is true in regards to the Formulate the Plan step of business continuity planning?
- A. You should list all the functions and services in the network.
- B. You should perform a business impact analysis.
- C. You should develop a plan of action to mitigate the risks.
- D. You should perform a risk assessment.
Answer: C
NEW QUESTION # 99
You are the network administrator for a large university, and are ready to upgrade your network. You want to solicit multiple vendors for design suggestions to help you define your plan moving forward.
Which two methods should you employ? (Choose two.)
- A. Publish an RFI to key vendors.
- B. Publish an RFP to key vendors.
- C. Require your reseller to submit a BOM.
- D. Attend industry conferences.
Answer: A,D
NEW QUESTION # 100
What is the first step of the Juniper recommended executive summary structure of an RFP?
- A. Overview of your proposed solution.
- B. Identification of business benefits.
- C. Introduction of the customer's need or problem.
- D. Relevant supporting information outlining why the customer should choose your plan.
Answer: C
NEW QUESTION # 101
Exhibit:
Referring to the exhibit, which two statements are correct in regards to VRRP? (Choose two.)
- A. You should use VRRP on the SRX devices for users in Group-B.
- B. You should use VRRP on the SRX devices for users in Group-C.
- C. You should use VRRP on the SRX devices for users in Group-A.
- D. You should use VRRP on the SRX devices to WAN connections.
Answer: A,B
NEW QUESTION # 102
Which tool in a Juniper Networks SDSN solution is responsible for telling Juniper and third-party network switches to block a threat in real time?
- A. SRX Series device
- B. Sky ATP
- C. Juniper Secure Analytics
- D. Policy Enforcer
Answer: B
NEW QUESTION # 103
You are asked to provide a design proposal for a service provider network. The design must ensure that customers are able to send Layer 2 traffic between sites.
In this scenario, which VPN technology would be used to accomplish this task?
- A. Layer 3 VPN
- B. EVPN
- C. GRE
- D. IPsec VPN
Answer: B
NEW QUESTION # 104
Your customers new network contains network devices from multiple vendors. You have been asked to propose two technologies that will work among all the vendors' networking equipment.
Which two technologies can you recommend for the design? (Choose two.)
- A. PVST+
- B. RSTP
- C. LLDP
- D. IGRP
Answer: B,C
NEW QUESTION # 105
In which network location should an external DNS server be placed?
- A. internet
- B. remote access
- C. enterprise branch
- D. campus data center
Answer: A
NEW QUESTION # 106
You customer currently has a hub-and-spoke VPN but has seen that the forwarding capabilities of the hub device being overwhelmed during times of high traffic between spoke devices. Also, due to recent cutbacks, the IT staff is already overwhelmed.
What should you recommend as a solution?
- A. Replace the hub-and-spoke VPN with a SSL VPN.
- B. Replace the hub-and-spoke VPN with an ADVPN.
- C. Replace the hub-and-spoke VPN with a full mesh VPN.
- D. Replace the hub-and-spoke VPN with a full mesh MPLS VPN.
Answer: B
NEW QUESTION # 107
Which statement is true in regards to VRRP?
- A. The maximum number of routing devices in a VRRP group is three.
- B. The maximum number of routing devices in a VRRP group is four.
- C. The maximum number of routing devices in a VRRP group is ten.
- D. The maximum number of routing devices in a VRRP group is two.
Answer: D
NEW QUESTION # 108
SRX Series devices support which type of HA feature?
- A. chassis clustering
- B. HSRP
- C. Virtual Chassis
- D. logical systems
Answer: A
NEW QUESTION # 109
What are three considerations for network capacity planning? (Choose three.)
- A. number of users
- B. user locations
- C. security regulations
- D. application behavior
- E. network management platform
Answer: A,B,D
NEW QUESTION # 110
What are two valid reasons to enable route summarization? (Choose two.)
- A. to enable the use of more than one routing protocol
- B. to reduce the coexistence of BGP with IGPs
- C. to benefit from a hierarchical IP addressing plan
- D. to reduce routing overhead
Answer: C,D
NEW QUESTION # 111
You have designed a network in which all network devices have redundant power supplies.
However, the redundant power supplies are plugged into a single power source.
Which two statements are true? (Choose two.)
- A. The redundant power supplies should be plugged into separate power sources.
- B. There is no problem and the power redundancy requirements are met.
- C. The power redundancy requirements are not met as the single source of power could fail and the network devices will not stay powered on.
- D. Redundant power supplies should always be plugged into the same power source.
Answer: A,C
NEW QUESTION # 112
In reviewing the customer's IT organization, you must determine the corporate model for IT funding.
Which two models would you encounter in this scenario? (Choose two.)
- A. profit center
- B. direct revenue model
- C. investment center
- D. cost center
Answer: A,D
NEW QUESTION # 113
You are designing a network design in which access between different groups must be tightly restricted.
What should you do to accomplish this task?
- A. A Layer 2 switch
- B. A Layer 3 switch
- C. A Layer 7 IDP
- D. A Layer 4 firewall
Answer: D
NEW QUESTION # 114
You are in the process of developing a business continuity plan for your network design. You must analyze data about weather patterns, maintenance history pertaining to leased buildings, and the frequency of power failures.
For which purpose would you collect this information?
- A. high availability
- B. redundancy
- C. risk assessment
- D. disaster recovery
Answer: C
NEW QUESTION # 115
What should be the second item in your network design checklist?
- A. A process for understanding the customer's business and technical goals.
- B. The steps for designing a network topology.
- C. A process for selecting protocols, address schemes, naming conventions, and so forth.
- D. A validation process for analyzing customer's existing environment.
Answer: D
NEW QUESTION # 116
You are the network architect with a large banking institution with operations around the world. Any outage results in lost revenue for your company, and may result in lost customers. Network uptime is your top priority.
What should be your focus?
- A. return on investment
- B. capacity planning
- C. business continuity
- D. service virtualization
Answer: C
NEW QUESTION # 117
You need to deploy an IPsec VPN technology that provides low application latency when a remote office is communicating with another remote office. This solution must also provide low management overhead.
Which IPsec VPN technology should you choose for this design?
- A. SSL VPN
- B. full mesh VPN
- C. hub-and-spoke VPN
- D. ADVPN
Answer: D
NEW QUESTION # 118
......
JN0-1103 Real Exam Questions and Answers FREE: https://www.actualtestsquiz.com/JN0-1103-test-torrent.html