
[Sep-2021] Pass Oracle 1z0-1075-20 Exam in First Attempt Guaranteed!
Full 1z0-1075-20 Practice Test and 65 unique questions with explanations waiting just for you, get it now!
NEW QUESTION 12
The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.
- A. Complete using quantity completion
- B. Change Move status to Ready.
- C. Change status of Operation to completed
- D. Complete with Details
- E. Quick Complete
Answer: D,E
NEW QUESTION 13
Identify two reports that provide work order cost-related information to the costing user.
- A. Cost Accounting Dashboard
- B. WIP Balance by Plant
- C. Work order Operational Analysis
- D. Purchase Variance Summary
Answer: A,C
NEW QUESTION 14
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?
- A. Select the infotile On Hold> Select a work order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
- B. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
- C. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
- D. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
Answer: B
NEW QUESTION 15
A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its existing Work Definitions. After copying from the existing Work Definition WD1 to the alternative Work Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing process WD2.
Identify the reason.
- A. The Item and Structure Name in the existing Work Definition WD1 were retained in the new Work Definition WD2 as well during creation.
- B. The Production Priority was not populated in the new Work Definition WD2 during creation.
- C. The Item and Structure Name were changed in the new Work Definition WD2 during creation.
- D. The Start Data was not populated in the new Work Definition WD2 during creation.
Answer: D
NEW QUESTION 16
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.
- A. Reverse from scrap to ready.
- B. Reverse the product at the last operation.
- C. Reverse resources charged to a work order.
- D. Reverse from reject to ready.
- E. Reverse at an operation.
- F. Reverse material issued to a work order.
Answer: A,C,D,F
NEW QUESTION 17
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.
- A. Create accounting
- B. Transfer Transactions from Production to Costing
- C. Transfer Transactions from Inventory to Costing
- D. Transfer Costs to Cost Management
Answer: B
NEW QUESTION 18
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.
- A. Production Priority
- B. Delete an Operation
- C. Add an Operation
- D. Completion Subinventory
- E. Costing Priority
Answer: A,C,D
NEW QUESTION 19
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.
- A. Rescheduled Work Order WO-2045 duration = 1.25 days
- B. Rescheduled Work Order WO-2045 duration = 3.25days
- C. Rescheduled Work Order WO-2045 duration = 0.75 days
- D. Rescheduled Work Order WO-2045 duration = 2 days
Answer: C
NEW QUESTION 20
In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can report the excess production completion?
- A. Overcompletion Tolerance Type = Percentage, value = 100
- B. Overcompletion Tolerance Type = Amount, value > 0
- C. Overcompletion Tolerance Type = Amount, value = 0
- D. Overcompletion Tolerance Type = Percentage, value > 0
- E. Overcompletion Tolerance Type = Percentage, value = 0
Answer: C,D,E
NEW QUESTION 21
In your customer's manufacturing facility, different types of Movement Requests are created. Key manufacturing components are issued to the work orders form the manufacturing subinventory. The manufacturing subinventory receives its supplies form the Warehouse subinventory through automatically created Movement Requests.
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory?
- A. Requisition Movement Requests
- B. Pick Wave Movement Requests
- C. Batch Wave Movement Requests
- D. Replenishment Requests
Answer: A
NEW QUESTION 22
The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.
- A. The Costing Interfaced Attribute is enabled in the resource definition.
- B. The Manage Item Rules setup is not complete.
- C. The item was made inactive after the Work Order transaction.
- D. The Costing Interfaced Attribute is not enabled in the resource definition.
Answer: D
NEW QUESTION 23
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception and who gets notified after an exception is raised?
- A. The Production Operator can report and exception and the application generates a notification that is sent to all users who have access to the manufacturing plant.
- B. The Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification.
- C. The Production Operator can report an exception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant.
- D. The Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated notification.
Answer: C
NEW QUESTION 24
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.
- A. Update Supply Plan Options, Overwrite Firm Planned Orders = None.
- B. Update Firm flag in the Details region of the Edit Work Order page.
- C. Update Firm flag in the Details region of the Edit Work Definition page.
- D. Update Firm flag in the Details region of the Edit Work Definition Names page.
Answer: A,B
NEW QUESTION 25
In a Manufacturing Cloud post production support environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.
Identify two reasons.
- A. The operations are missing sequence.
- B. None of the operations include scheduled resources.
- C. The scheduled resources are not part of the organization selected by the user.
- D. The work order operations do not have operations start or completion date.
Answer: A,B
NEW QUESTION 26
Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?
- A. Select a resource that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
- B. Ensure there is only one default standard operation at a given point in time.
- C. Ensure the predefined work definition name ORA_MAIN name is active.
- D. Ensure the item is a standard item with a secondary item structure.
- E. Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
Answer: C,D,E
NEW QUESTION 27
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
- A. Create Accounting was not initiated.
- B. Costs for purchase components P1 and P2 are not defined in cost accounting.
- C. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
- D. Create Accounting Distributions was not initiated.
Answer: D
NEW QUESTION 28
......
Get Latest 1z0-1075-20 Dumps Exam Questions in here: https://www.actualtestsquiz.com/1z0-1075-20-test-torrent.html

